Efficiency to your advantage
EventBridge hires out mobile, temporary footbridges for events, sporting events, festivals and projects in Germany and across Europe. Our bridges provide safe, elevated crossings for visitors, participants and staff, for example over roads, obstacle courses, access routes or crowds of visitors.
An EventBridge has been developed as a TÜV-certified modular bridge system. Thanks to the limited number of standardised components, preparation, technical checks and installation remain straightforward and efficient. Depending on the situation , a fully assembled bridge can be positioned in its final location in as little as 5 minutes. The total project duration for assembly is around 6 hours, including crane positioning and a time buffer; dismantling takes around 5 hours.
This speed is achieved through the innovative system, careful preparation and standardised procedures. This also makes it possible to use inner-city streets, central squares or traffic areas with tight time windows. Traffic disruption, the coordination effort and the burden on project management can thus be reduced.
EventBridge is not a lightweight temporary solution. A bridge unit consists of around 22 tonnes of material and is constructed from solid steel sections. This ensures stability and a secure walking experience even with large crowds. At a basic level, two fitters, a lorry and a crane are sufficient to install a bridge. This keeps the operation straightforward and cost-effective.
With up to 130 m² of advertising space, the bridge also becomes an eye-catching promotional feature. EventBridge has been in use in Germany and across Europe for more than 10 years and is deployed at festivals, sporting events, conferences and temporary projects. This is how we combine safety, speed and efficiency.